We present to your attention the work on thermal insulation of a country cottage in the Yaroslavl region. The facility met a classic problem of a base made of poured monolithic slab and the base began to freeze. To eliminate this problem, after consulting with the dealer, it was decided to cover the base with a vapor-permeable modification of Bronya Facade in combination with a grid reinforcement with a mesh.
According to the calculated heat, it was necessary to apply 1.5 mm of Bronya Facade material, and together with the reinforcement the total thickness amounted to a little more than 2 mm. The carefully prepared, cleaned and dust-free surface was primed with a deep penetration primer of Bronya, after which a layer of 0.5 mm Bronya Facade was applied, after that, a mesh tape was applied to the wet layer, then again a layer of 0.5 mm Bronya Facade, and the last finish layer of the material was wrapped in a pleasant chocolate hue. The base is fully prepared for the cold, which means that the house retains warmth and comfort. The customer was very pleased.