We present you the Photo Report of the coverage of the heating unit of the Railway Station of the village. Sheksna in the Vologda region.
At this facility, to reduce heat loss and pipe surface temperature, excluding the possibility of burns, the Bronya Classic modification was used, the material was applied with a brush, in two layers of 0.5 mm. with interlayer drying 24 hours. The result exceeded all expectations, our material once again perfectly coped with the task.